From crisis management to permanent leadership: Industrial leadership in the Spanish subsidiary of a French Group

Share on:

How an Interim Manager covered an unexpected critical absence and consolidated the Factory Management after 5 months of high-performance management.

Client and Sector:

Our client is the Spanish subsidiary of a prestigious French industrial groupThe company, key to the group's international strategy, maintains a production plant in Spain that demands operational excellence standards aligned with the headquarters in France.

The Situation / Need (The Pain):

The organization suffered a severe blow to its chain of command: the Factory Director caused sudden sick leave due to serious illnessThis unforeseen situation left the plant without its top manager overnight, creating an immediate risk of operational mismanagement and a lack of communication with the French parent company. The company could not afford a lengthy selection process or leave the position vacant; it needed immediate executive leadership to ensure continuity.

The Approach and the Solution EPUNTO (The Methodology):

EPUNTO activated in record time a Interim Manager (COO) with industrial profile senior and the ability to adapt culturally to French multinational environments. The executive assumed full control of the factory without a handover period, stabilizing operations from the first week.

During the 5 months During the initial mission, the Interim Manager not only covered the absence but also optimized processes and gained the trust of the team and headquarters. Given the impossibility of the previous director's return, and considering the excellent results achieved ("Accountability"), the company decided to hire the Interim Manager on a permanent basis as the new Factory Director, transforming an emergency solution into a successful strategic hire.

Partner responsible for the project

Patricio Gil Olmedo

Managing Partner

Some questions and answers

What was the main challenge in this project?

The challenge was the immediacy and the absence of a replacementBecause it was a sudden medical leave, there was no transfer of power. The manager had to arrive at the plant, assess the situation, and take operational control ("take charge") without a prior roadmap, reporting directly to a demanding international group.

Due to critical urgency. In the event of a sick leave due to serious illness, the reaction time is zero. headhunter Traditionally, it would have taken months to present a suitable shortlist. EPUNTO placed a qualified manager in place in days, ensuring that the factory didn't lose its way for even a single shift.

La pacification and continuityThe Interim Manager managed to convey calm and security to the workforce and the French parent company, demonstrating that the factory was under professional control despite the human crisis caused by the illness of the previous leader.

In this case, the transfer became consolidationWhen it was confirmed that the previous director would not be returning, the knowledge generated by our Interim Manager did not have to be transferred to a third party, but was instead capitalized on by him remaining as the permanent Factory Director (Interim to Permanent).

La quality of the "matching"We found not only an operations expert, but also a leader capable of fitting into the culture of a French group subsidiary and managing an emotionally complex situation following the departure of his predecessor. The success was such that the client didn't want to let him go.

Fill out the following form with your information and We will contact you as soon as possible.

Also You can call us whenever you need us.

(Outside of Spain)
(From Portugal)

Madrid Office

EPUNTO Interim Management
C. de Henri Dunant, 17, Chamartín, 28036 Madrid

Valladolid Office

EPUNTO Interim Management
P.º Pérez de Ayala, 9, local 10,
47008 Valladolid

Portugal Office

Av.República Nº6, 1ºesquerdo
1050-191 Lisboa